Delivery Services / Packaging & Shipping
Prepare fabricated steel for identification, protection, transport and practical unloading at the destination site.
Group components around shipping limits, unloading method and installation sequence.
Use separators, edge protection and wrapping appropriate to the component and finish.
Connect bundles and loose items to piece marks, packing lists and drawing references.
Arrange weight and access so unloading can be planned before the shipment arrives.
Shipment Information
Clear records help the receiving team identify what has arrived and what should happen next.
+Packing list by bundle, crate or shipping unit
+Piece marks and assembly references
+Weight and handling information where applicable
+Shipment identification and release status
+Receiving notes for visible transport damage
Destination Readiness
Container or vehicle limits, route constraints, unloading equipment, laydown space and erection order should be considered before final packing.
+Confirm access and unloading method
+Separate priority steel where practical
+Protect small parts and connection items
Share the destination, transport mode, site access and required delivery sequence.