Delivery Services / Packaging & Shipping

Steel Structure Packaging & Shipping

Prepare fabricated steel for identification, protection, transport and practical unloading at the destination site.

steel structure transportation steelspan lab

01

PLAN

Group components around shipping limits, unloading method and installation sequence.

02

PROTECT

Use separators, edge protection and wrapping appropriate to the component and finish.

03

MARK

Connect bundles and loose items to piece marks, packing lists and drawing references.

04

LOAD

Arrange weight and access so unloading can be planned before the shipment arrives.

Shipment Information

Documents That Travel with the Load

Clear records help the receiving team identify what has arrived and what should happen next.

+Packing list by bundle, crate or shipping unit

+Piece marks and assembly references

+Weight and handling information where applicable

+Shipment identification and release status

+Receiving notes for visible transport damage

steel structure project steelspanlab

Destination Readiness

Shipping Decisions Affect Site Productivity

Container or vehicle limits, route constraints, unloading equipment, laydown space and erection order should be considered before final packing.

+Confirm access and unloading method

+Separate priority steel where practical

+Protect small parts and connection items