Industrial Projects / Transport and Infrastructure
Large Steel Systems for Movement and Public Infrastructure
Five cases focus on long-span roofs, transit halls, station canopies and bridge structures where geometry, erection sequence and durable finishes shape the work.
Discuss a project01

Airport / Al Khor, Qatar
Terminal Concourse
Orthogonal space frame with forward-leaning tapered columns. White fluorocarbon coating and stainless ball nodes.
- Location
- Al Khor, Qatar
- Delivered
- 11 / 2021
- Area
- 186,000 sq ft
- Steel
- 4,850 t
02

High-speed rail / Jeddah, Saudi Arabia
Arch Gridshell
Three-centred double-layer gridshell with bolted ball joints. Galvanised steel bolted on site.
- Location
- Jeddah, Saudi Arabia
- Delivered
- 04 / 2025
- Area
- 154,000 sq ft
- Steel
- 5,240 t
03

High-speed rail / Kuala Lumpur, Malaysia
Platform Canopy
Multi-span arch tubular trusses with deck skylights. Grey fluorocarbon coating and polycarbonate skylights.
- Location
- Kuala Lumpur, Malaysia
- Delivered
- 07 / 2020
- Area
- 63,800 sq ft
- Steel
- 1,780 t
04

Metro / Dubai, United Arab Emirates
Ribbed Transit Hall
White steel ribs with a continuous ridge skylight. High-gloss coating and aluminium skylight frames.
- Location
- Dubai, United Arab Emirates
- Delivered
- 10 / 2022
- Area
- 57,300 sq ft
- Steel
- 2,140 t
05

Bridge / Wroclaw, Poland
Riveted Truss Bridge
Warren through-truss with top bracing and riveted joints. Weathering rust-red paint with rivets retained.
- Location
- Wroclaw, Poland
- Delivered
- 10 / 2017
- Area
- 28,600 sq ft
- Steel
- 3,180 t
Shared project questions
What These Infrastructure Cases Require
01Geometry
Set the span, curvature, support line and movement joints before member production.
02Interfaces
Coordinate glazing, skylights, cladding, platforms and public circulation with the primary steel.
03Erection
Plan temporary stability, segment size, bolted joints and access around the site sequence.
Reference portfolio: Use these structural typologies to compare systems, spans, indicative tonnage and delivery considerations. Project-specific claims and final scope are confirmed only by the corresponding contract, drawings and inspection records.