Site Services / On-Site Installation

Steel Structure On-Site Installation

Coordinate site readiness, lifting, temporary stability and erection information so the steel frame can be assembled in a controlled sequence.

On-Site Installation reference image 2705

READY

Access + foundations

LIFT

Equipment + sequence

STABILIZE

Bracing + temporary state

VERIFY

Alignment + connections

Erection Workflow

Plan the Temporary State, Not Only the Finished Frame

During erection, the structure passes through temporary conditions that require sequence, bracing and site responsibilities to be clear.

01

Site readiness

Foundations, access, lifting areas, storage zones and temporary conditions are reviewed before erection starts.

02

Erection sequence

Frames, bracing, secondary steel and envelope interfaces are planned as a stable progression.

03

Alignment and connections

Plumb, level, bolt installation and field connections follow the approved erection information.

04

Handover checks

Outstanding items, touch-up, records and interface completion are reviewed before handover.

Before Mobilization

Site Inputs to Confirm

+Foundation and anchor interface status

+Access routes, crane positions and ground conditions

+Laydown and component identification areas

+Approved erection drawings and lifting assumptions

+Temporary bracing and weather limitations

On-Site Installation reference image 2706

Installation FAQ

Practical Questions Before Steel Arrives

01

Who confirms foundations?

The responsible project parties must establish foundation and anchor readiness before erection.

02

How is sequence decided?

The sequence considers stability, access, lifting limits, delivery order and follow-on trades.

03

What about weather?

Wind, rain, visibility and ground conditions should be included in site planning and daily decisions.

04

How are changes handled?

Site queries and deviations should be recorded, reviewed and resolved through the agreed approval route.

Preparing for Steel Erection?

Send the site location, programme, drawings and access information for an initial installation review.