Coordinate site readiness, lifting, temporary stability and erection information so the steel frame can be assembled in a controlled sequence.
Access + foundations
Equipment + sequence
Bracing + temporary state
Alignment + connections
Erection Workflow
During erection, the structure passes through temporary conditions that require sequence, bracing and site responsibilities to be clear.
Foundations, access, lifting areas, storage zones and temporary conditions are reviewed before erection starts.
Frames, bracing, secondary steel and envelope interfaces are planned as a stable progression.
Plumb, level, bolt installation and field connections follow the approved erection information.
Outstanding items, touch-up, records and interface completion are reviewed before handover.
Before Mobilization
+Foundation and anchor interface status
+Access routes, crane positions and ground conditions
+Laydown and component identification areas
+Approved erection drawings and lifting assumptions
+Temporary bracing and weather limitations
Installation FAQ
The responsible project parties must establish foundation and anchor readiness before erection.
The sequence considers stability, access, lifting limits, delivery order and follow-on trades.
Wind, rain, visibility and ground conditions should be included in site planning and daily decisions.
Site queries and deviations should be recorded, reviewed and resolved through the agreed approval route.
Send the site location, programme, drawings and access information for an initial installation review.