Steel Span Lab has published a practical project enquiry checklist to help steel structure reviews begin with clearer information. The checklist does not require every decision to be final. Its purpose is to separate confirmed requirements, available documents and open assumptions.
Core project information
- Project country, city and site conditions.
- Building use and operational requirements.
- Overall dimensions, clear heights and preferred layout.
- Target programme and delivery destination.
Design information
- Applicable codes and authority requirements.
- Available environmental and structural load data.
- Equipment, crane, mezzanine and suspended-service loads.
- Fire, corrosion, thermal and envelope requirements.
- Geotechnical report or known foundation constraints.
Openings and interfaces
- Large doors, loading docks, canopies and penetrations.
- Cladding, drainage, ventilation and service routes.
- Areas that must remain column-free.
- Future expansion or adaptability requirements.
Available documents
Useful starting documents can include a site plan, survey, architectural layout, equipment schedule, door data, geotechnical information and reference standards. Preliminary drawings are acceptable when their status is clear.
What happens when information is missing?
Missing items should be recorded as questions or explicit assumptions. They should not be converted into silent design claims. As the project develops, the brief and revision history can be updated.
Use the checklist
Send the available location, use, dimensions and drawings through the Steel Span Lab contact page. For project-type guidance, visit the Project Guides section.
The checklist supports initial coordination only. Final design and compliance requirements must be established by qualified professionals for the project.